Deactivate a report job

If you want to save a report schedule, but temporarily stop running the job, you may deactivate it:.

  1. On the VTR main menu, click Reporting, and then click the Scheduling tab.
  2. In the last column of the report you want to edit, click the details link.
  3. Drop down the Frequency list, and choose Never.
  4. To save changes, click Submit.

To reactivate the job, go back to this page and choose the frequency with which you want to run it.